SITE ACCEPTANCE SOLUTION
Enhance operational efficiency and cut down expenses when deploying new sites
CSPs navigate the dual challenge of integrating new sites seamlessly into existing networks, addressing compatibility issues, while managing cost-effectiveness during deployment.
CHALLENGES
Streamlining the integration of new sites into the existing network infrastructure is pivotal. Overcoming complexities such as compatibility issues, interoperability challenges, and ensuring seamless service handovers between sites becomes imperative.
Integration with existing Radio Access Technologies
Quality assurance entails confirming that the newly deployed site aligns with established benchmarks for coverage, capacity, and reliability, with a concurrent consideration of its impact on neighboring sites. Typically, field measurements concentrate on the specific deployment area rather than monitoring the broader global cluster.
Monitoring the impact on customer experience
Following field measurements, engineers utilize processing tools to generate comprehensive reports, a process that may extend over several days.
Current processes may extend acceptance report building time
The absence of a centralized reports repository is noteworthy, as the prevailing practice involves the creation of reports in Excel format, which are subsequently disseminated via email. This reliance on email-based distribution potentially poses challenges in terms of version control, accessibility, and overall document management efficiency.
Absence of a centralized reports repository
For new site integration issues, the current procedure involves a manual root cause analysis to facilitate issue resolution.
Manual root cause analysis
Engineers require specialized tools to comprehensively monitor network energy consumption from various perspectives.
Multiple tools are required
Kenmei automates Site Acceptance procedure using geolocation and performance reports, eliminating the necessity for field measurements.
VALUE PROPOSITION
Various maps, including Best Server, PCIs, RSRP, RSRQ, and other performance maps, are available.
PERFORMANCE MAPS
Comparing KPIs against expected SLAs.
SLA COMPLIANCY
Analyze daily changes in parameters database and compare actual versus expected network parameters.
BASELINE ASSURANCE
Multi-RAT simultaneous analysis of the Acceptance procedure.
MULTI-RAT ANALYSIS
Automating Site Acceptance processes brings efficiency by streamlining workflows and reducing deployment time. It ensures consistency, minimizes errors, and achieves cost savings.
BENEFITS
Digitizing the acceptance process without the need for field measurements reduces the overall cost of the procedure.
Cost savings per deployed site
>600€
Increase impact visibility at the cluster level rather than the current site-specific level.
Enhance visibility within the cluster
x3
Decreased from 7 days to 1 day due to automated report generation from multiple data sources.
Accelerated report generation
x7
Accelerates problem identification and resolution when the deployment of a new site impacts user experience.